000 | 03042nam a22003257a 4500 | ||
---|---|---|---|
003 | OSt | ||
005 | 20250306223731.0 | ||
008 | 220816b ||||| |||| 00| 0 eng d | ||
040 |
_aCvSU-CCAT Campus Library. _bEnglish. _cCvSU-CCAT Campus Library. _erda. |
||
050 |
_aUM TS 228.95 _bC46 2017 |
||
100 |
_aCenteno, Jonard G., author. _96587 |
||
245 |
_aDevelopment of Arc welding booth with welding positioner / _cJonard G. Centemo and Cedric D. Embudo. |
||
260 |
_aRosario, Cavite : _bCavite State University-CCAT Campus, _c2017. |
||
300 |
_axv, 59 leaves : _blllustrations ; _c28 cm |
||
500 | _aUndergraduate Thesis (BSIT - Major in Welding Fabrication Technology) -- Cavite State University-CCAT Campus, 2017. | ||
504 | _aIncludes bibliographical references and appendices. | ||
520 | _aCENTENO JONARD G. and EMBUDO CEDRIC D., Development and Evaluation of the Arc Welding Booth with Welding Positioner. Undergraduate Project Design. Bachelor of Science in Industrial Technology. Cavite State University, Rosario Cavite. 2016.Adviser: Mr. Lauro B. Pascua. Technical critic: Mr. Josefino E. Ambayec. The study was conducted from June 2015 to December 2016 at Cavite State University Rosario Campus in Welding and Fabrication Building to develop an Arc Welding Booth with Welding Positioner. Specifically, the study aimed to: 1) Design the welding table for Welding Booth. 2) Construct the Arc Welding Booth with Welding Positioner from supply and materials available in the local market. 3) Evaluate the performance of the project in terms of: a. Time of welding using welding positioner b. Number of observer can accommodate by the booth; c. Visibility of the sliding dark glass and 4) Conduct a cost analysis for the Arc Welding Booth with Welding Positioner. The prototype was constructed with different parts such as the main table frame, welding positioner, the booth and the fixed dark glass around it. The right side of the welding booth can be also used for Oxy-acetylene process. The developed project's welding positioner with welding booth can weld pipe in different position. The vertical position consumed more time to weld pipe as compared to horizontal and flat position. The welding positioner and booth can accommodate 7 observer to watch the demonstration teaching in any part of the booth. The visibility was very clear at a distance of 0.5 meter and clear only at a distance of 1-1.5 meter. The total cost of the project was PHP.13,122.40. | ||
546 | _aIn English text. | ||
650 |
_aArc welding booth. _914670 |
||
650 |
_aWelding positioner. _95995 |
||
650 |
_aWelding trainer. _914671 |
||
650 |
_aPrecision welding. _914672 |
||
650 |
_aIndustrial engineering. _9883 |
||
650 |
_aAdjustable positioner. _914673 |
||
700 |
_aEmbudo, Cedric D., author. _96588 |
||
700 |
_aPascua, Lauro B., adviser. _95899 |
||
700 |
_aAmbayec, Josefino E., technical critic. _96346 |
||
942 |
_cT/M/D _2lcc _hTS 228.95 C46 2017 _kUM |
||
999 |
_c1929 _d1929 |